• Post information
  •   
Site Incharge
Last Date:- 13-04-2024
details

Desgination:-Larsen & Toubro Limited
Location:-Raurkela, Orissa
Experience: 6 months and above

About L&T-SuFin:

  • Extensive knowledge in Boiler pressure parts, Structure, Ducting, Burner Management system, commissioning and maintenance. In-process Inspection, Site Management, Schedule Planning, Health & Safety, Resource Coordination, Client and Contractor billing and MIS tracking, EPC Contractor Coordination, NDT activities DPT, RT & Heating Processes, Preparation & review of MIS reports, Preparation and analysis of Planned v/s Actual Progress Chart (S- Curve), Work Order Closure and MIS Generation.
  • Rectifying tube leakages, in pressure parts: Water wall, coil bends.
  • Capable to manage the customer with good relationship, Implementation of EHS & Quality Documents & procedures, Implementation of work related SOPs at site.
  • Planning of periodic inspections to ensure smooth operation of Boiler/ erection schedule and pre-assembly of pressure parts, Duct, Structure etc.
  • Preparation of boiler material record as per the drawings and initiate purchase of critical inventory.
  • Maintenance of Burner management system, replacement of burner oil gun hoses and nozzles, Erection & Commissioning of burner management system and boiler house integral piping.
  • Resolving issues, deviations; negotiate amicably as per the contract with Client and Contractor with project centric and cost effective approach.
  • Liaising work with IBR authorities for preparation and submission of necessary documentation at IBR Office, Bhopal, MP. Site IBR inspections for Boiler pressure parts.
  • Accountable for inspection of incoming material as per standard & specifications, participating in review meeting with contractors and coordinating with PMO / OEM for site modification and related activities.
  • Engaging contractor, manpower & machineries as per the compliance with relevant health & safety guidelines while maintaining harmonious & industrial relation environment on site.
  • Ensuring effective site management and discipline in coordination with planning team for safe & timely execution of the boiler erection works.

site
Related Updates

Parents can't watch movies and

Infosys founder NR Narayana Murthy recen

Read more »

Counsellor

Apply by: 22/07/2023Position: Counsellor

Read more »

VIrtual IRIS National Fair Pro

The IRIS National Fair promotes and nurt

Read more »

Genetic Engineering Science Pr

Genetic engineering, also called gene ed

Read more »

IKHEDUT TAR FENCING(BARBED WIR

Dear ojasadda.com Readers today we bring

Read more »

LIC 5000 Assistant Online Form

Life Insurance Corporation of India (LIC

Read more »

AIISH Notification 2020 – Open

All India Institute of Speech and Hearin

Read more »

STFC India Meritorious Scholar

About theProgram
Shriram Transport Fina

Read more »

Arvind’s Freedom Traders: Enha

Stock Market being an ever-evolving indu

Read more »

Gurudatta Training Institute:

Today, there is an extraordinary amount

Read more »